The project addressed long-standing challenges, particular the poor drainage issues on the existing practice ground, transforming the area into a modern, state-of-the-art golf facility.
The newly developed range now spans 300-yards and incorporates the latest TrackMan technology, elevating the practice sessions for golfers of all levels. Alongside this, we established a dedicated short game area and improved site infrastructure. All designed to improve the overall experience for club members and visitors alike.
CLIENTManchester Golf Club
LOCATIONRochdale Road, Middleton, M24 6QP
SERVICESGolf Course Design, Golf Course Planning, Golf Course Construction, Practice Facility Creation, Infrastructure
Working closely with Manchester Golf Club and Gaunt Golf Design, we turned the vision for this facility into reality. The redesign of the driving range was focused on addressing the longstanding drainage concerns, incorporating a gradual gradient to improve ball visibility and retrieval.
The short game area was also carefully design, with a large practice green and two practice bunkers.
Additionally, the site’s infrastructure was upgraded to improve access and provide additional car parking for the new practice areas.
To bring this ambitious project to life, we navigated a detailed planning process with Rochdale Council. Our team successfully obtained all the necessary permissions by submitting comprehensive master plans that outlined improvements to the driving range, parking facilities, the short-game area, and overall site accessibility.
A key part of the project’s success was our commitment to sustainability. We secured environmental permissions for the responsible importation of local construction soils, ensuring compliance with a CL:AIRE materials management plan.
This sustainable approach allowed us to improve the grounds while minimising environmental impact
Throughout the construction process, our team demonstrated meticulous attention to detail, ensuring the vision of Manchester Golf Club was brought to life with precision. A key aspect of the project was the careful management and importation of local construction soil, which were rigorously analysed to meet environmental and quality standards.
In addition to shaping the landscape, we prioritised the installation of an advanced drainage system to effectively address previous challenges. This new system ensures optimal water management across the driving range and practice areas, enhancing playability and maintaining the facility in peak condition. The construction team expertly shaped the landscape, aligning the topography with the design specifications to create a seamless blend of functionality and aesthetics.
From the perfectly contoured driving range to the finely crafted short-game areas, each feature was constructed with the goal of enhancing both performance and visual appeal. The end result is a world-class facility that showcases the very best in golf course development, delivering an exceptional experience for all users.
The Manchester Golf Club has developed an excellent working relationship with Booth Golf & Leisure over the last few years. From initial discussions to concept design and moving forward into implementation, Booth Golf & Leisure has impressed us with their professionalism, enthusiasm, and commitment. On a personal level, the management including John and Rob have been first class and the site team who have been on site have been professional, courteous, and friendly. I have no hesitation in recommending Booth Golf & Leisure to other golf clubs as an excellent partner.